Callie Link
Callie Link keeps several Callie Grams machines in step, so a backup is ready to take over if the main machine fails. One machine is the Main and every other machine is a Backup. Everything the Main fires also fires on its Backups, and each Backup keeps a copy of every project on the Main, media included.
Using Callie Link is perfect for running a disaster recovery setup and also for duplicated audio playback over a larger site.
Setting Up the Main
Section titled “Setting Up the Main”- On the main machine, open Preferences → Callie Link.
- Under This machine, choose Link Main.
- Check the Link key. One is generated for you, or you can type your own. Use Copy key to copy it for your Backups.
- Leave Link port on
9300unless that port is already in use. - Click Save Link Settings.
Backups connect to this machine’s address on the link port. Allow both UDP and TCP on that port through any firewall.
Connecting a Backup
Section titled “Connecting a Backup”- On the backup machine, open Preferences → Callie Link.
- Choose Backup (connect to a Main).
- Enter the Main’s address, such as
192.168.1.20orhost.local. - Paste or type the Link key. Capitals, spaces and dashes don’t matter.
- Set Link port to the Main’s link port.
- Click Save and Connect.
Generating a new key on the Main disconnects every Backup until you give them the new key.
What Gets Mirrored
Section titled “What Gets Mirrored”These actions on the Main are sent straight to every Backup:
- Button presses, with each button’s normal behaviour, including action buttons and Custom Events
- Stop All, Stop Output, Stop Gang and Stop Group
- Events and timecode cues
- Skipping a playlist track
- Project switches and page changes
Buttons are matched by their position in the grid, so every machine needs the same layout loaded. The status indicator warns you if a layout differs.
Timecode cues only fire on the Main, because each machine’s clock can differ. Backups play the Main’s mirrored action instead. If the Main goes offline, a Backup carries on with its own cues.
Actions Fired on a Backup
Section titled “Actions Fired on a Backup”By default, what a Backup fires stays on that Backup. To change this, enable Backups’ actions fire on every machine on the Main. Anything fired on a Backup then also fires on the Main and on every other Backup.
Link Projects
Section titled “Link Projects”Each Backup keeps a copy of every project on the Main as a Link project. These appear on the Link tab of the Projects window, separate from the machine’s own projects on the Local tab.
Link projects use the Main’s numbers with a PRL prefix, so PRJ:003 on the Main is PRL:003 on a Backup. You can switch to one over OSC with /callie/prl/003. See Web API and OSC.
Staying in Step
Section titled “Staying in Step”Keep Link projects in step with the Main automatically is on by default. Media downloads straight away, and the loaded project is only replaced when nothing is playing. After the first sync, only the files a Backup doesn’t already have are transferred.
With this option off, changes only arrive when you click Sync now.
Projects removed from the Main are also removed from its Backups.
Switching Projects on a Backup
Section titled “Switching Projects on a Backup”While the Main is online, a Backup can only open the Link project the Main has open, so nobody plays from a different show by mistake. If the Main switches project while a Backup is playing, the Backup follows when its playback stops.
Local projects can always be opened. If the Main goes offline, a Backup can open any project, so it can carry on alone.
Editing Link Projects
Section titled “Editing Link Projects”Link projects are read-only on Backups by default. To allow edits, enable Backups can edit Link projects on the Main. An edit made on a Backup is then sent to the Main and on to every other Backup. If the project has already changed on the Main, the Backup’s edit is turned down.
Sending a Project to the Main
Section titled “Sending a Project to the Main”To move a Local project from a Backup to the Main, use Send to Main on the project in the Projects window. The Main’s operator is asked to Accept or Decline, and the request lapses after two minutes.
An accepted project is added to the Main as a new local project. It isn’t loaded, so the running show isn’t interrupted.
Checking the Link
Section titled “Checking the Link”A status dot in the header shows the health of the link. Hover over it for a summary, or click it for details. The full status is also in Preferences → Callie Link and on the Link tab of the Projects window.
| Dot | Meaning |
|---|---|
| Green | The link is healthy. |
| Syncing | Projects are being copied to this Backup. |
| Grey | This Main has no Backups connected yet. |
| Amber | Needs attention, such as a different layout, a Backup offline, or a Backup waiting to follow the Main. |
| Red | Action needed: the Main is offline, project sync failed, or another machine is also acting as Main. |
If the Main Fails
Section titled “If the Main Fails”A Backup shows the Main as offline after about three seconds, and keeps running on its own:
- Everything it has already synced stays available.
- It fires its own timecode cues.
- It can open any project.
Connections are protected by the link key, so two shows on the same network can’t trigger each other.
- Let the first sync finish before the show, as it copies all the media.
- Check every machine has the same layout loaded.
- Rehearse a failover: disconnect the Main and check the Backup does what you expect.